Podcasts

News

Road reconstruction on East Georgia Ruth Drive in South Padre Island is underway to improve drainage, parking, and pedestrian access near Beach Access 21, as part of broader 2026 side street upgrades.
October 2026 saw above-average rainfall in the South Padre Island area, with 5.6 inches recorded versus a 1.6-inch average; most rain fell early in the month before tapering off.